Service Areas
Utility Territories
Guidance by utility: procurement steps, delivered-cost comparisons, and demand-side tactics specific to each territory.
ComEd (IL)
PJM • Chicago area
PECO (PA)
PJM • Philadelphia
PPL Electric (PA)
PJM
PSE&G (NJ)
PJM
JCP&L (NJ)
PJM
Con Edison (NY)
NYISO • NYC
Eversource (MA)
ISO-NE
National Grid (MA)
ISO-NE
Eversource (CT)
ISO-NE
United Illuminating (CT)
ISO-NE
BGE (MD)
PJM • Baltimore
Pepco (MD)
PJM
AEP Ohio
PJM
Duke Energy Ohio
PJM • Cincinnati
Oncor (TX)
ERCOT • Dallas
CenterPoint (TX)
ERCOT • Houston
AEP Texas
ERCOT
TNMP (TX)
ERCOT
Compare Utility Territories
Quick reference for market context and links. For full guidance, open each utility page.
| Utility | Market | Primary Area | Notes | Details |
|---|---|---|---|---|
| ComEd | PJM/MISO | Chicago, IL | Active supplier competition; demand mgmt valuable | Open |
| PECO | PJM | Philadelphia, PA | Capacity/transmission tags; watch renewal timing | Open |
| PPL Electric | PJM | Pennsylvania | Delivered-cost comparisons important | Open |
| PSE&G | PJM | New Jersey | Strong retail competition; peak planning | Open |
| JCP&L | PJM | New Jersey | Compare pass-throughs closely | Open |
| Con Edison | NYISO | New York City, NY | Basis + delivery matter; demand heavy | Open |
| Eversource (MA) | ISO-NE | Massachusetts | Peaks drive capacity/transmission | Open |
| National Grid (MA) | ISO-NE | Massachusetts | Layer hedges; shoulder-season timing | Open |
| Eversource (CT) | ISO-NE | Connecticut | Interval data useful for peak audits | Open |
| United Illuminating | ISO-NE | Connecticut | Compare swing terms; validate first bill | Open |
| BGE | PJM | Baltimore, MD | Peak mitigation reduces non-commodity costs | Open |
| Pepco (MD) | PJM | Maryland | Run same-day RFPs for apples-to-apples | Open |
| AEP Ohio | PJM | Ohio | Delivered-cost clarity critical | Open |
| Duke Energy Ohio | PJM | Cincinnati, OH | Peak windows vary; plan operations | Open |
| Oncor | ERCOT | Dallas–Fort Worth, TX | REP competition; sequence large loads | Open |
| CenterPoint (Houston) | ERCOT | Houston, TX | Demand strategy impacts TDSP components | Open |
| AEP Texas | ERCOT | Various, TX | Layering + trigger-based purchasing | Open |
| TNMP | ERCOT | Various, TX | Delivered-cost normalizations essential | Open |