A PJM capacity result is a wholesale availability price for a specified delivery period. Identify the delivery year and contract treatment before applying any headline to a property budget.
Keep three dates separate
Record the auction date, delivery year procured and date costs apply under the customer's arrangement. These differ. A reference to a 2026 auction can otherwise confuse auction timing with service timing.
Use PJM's capacity-market page and official report for the relevant delivery year. Later auctions and contract start dates can make an older headline irrelevant.
Capacity is different from energy
Energy pays for electricity produced; capacity compensates availability under market rules. Retail delivery, transmission and other charges have their own treatment.
Do not multiply an auction percentage change by the total bill. Exposure depends on the applicable capacity obligation, location, dates, adjustments and cost-recovery arrangement.
Questions for suppliers
- Is capacity included or passed through?
- Which quantity or tag is used?
- Can quantities or costs be reconciled during the term?
- Which delivery years are covered?
- How do load changes affect obligations?
- What market-rule or change-in-law costs are excluded?
Require the same answers from bidders. Two prices labeled fixed can carry different risks.
Peak management needs the right measurement
Monthly maximum demand is not automatically the capacity obligation. Obtain the applicable calculation and windows. Coordinate actions with tenants and operators.
Interval data helps identify flexible loads. Future peak events are uncertain; evaluate forecast error and curtailment cost instead of treating a prediction as guaranteed savings.
Build the property budget
Separate cost components where possible. Use signed terms as the base case with sensitivities for exposed components. Identify owner-paid and reimbursed costs.
Does an auction mean lock immediately?
No single result identifies the best date or term. Compare executable offers for the same start, load, term and exclusions. Use budget tolerance, operating plans and renewal deadlines.
Sources and scope
- ENERGY STAR: building benchmarking
- PJM: demand response
- PJM: capacity market and current auction materials
Reviewed October 12, 2026. Confirm effective tariffs, program rules and signed terms for the actual account. Hypothetical examples are planning calculations, not current offers or client results.