Landlord energy decisions connect accounts, operations and leases. Identify who pays, who controls load and who retains benefits.
Map responsibilities
Register common-area, central-plant, vacant-space and tenant accounts. Record holder, payer, equipment and reimbursement. An owner cannot change a tenant's separate contract without authority.
Review executed leases, caps, exclusions and reconciliations. Gross or net labels alone do not resolve allocation.
Common-area load
Review lighting, ventilation, pumps, lifts and after-hours schedules. Investigate interval patterns onsite. Comfort, air quality and safety changes require appropriate review.
Establish weather, occupancy and hours so improvements can be distinguished from reduced use.
Submetering and tenants
Submetering can improve visibility without automatically creating billing rights. Confirm utility rules, lease permissions, accuracy, administration and data access.
Track fit-outs and hours; tenants can change load shape and future procurement assumptions.
Green leases
Green leasing can address split incentives. Consider data sharing, operational coordination and agreed allocation of project costs and verified savings. Counsel should translate agreements into lease language; sample clauses do not establish universal returns.
Supply procurement
Compare accounts you control using the same dates, data and inclusions. Document compensation, tolerances, pass-throughs and sale or closure provisions. Portfolio coordination still needs meter-level accountability.
Owner-retained benefit
Utility reductions can reduce tenant reimbursements. Deduct lost recovery and new recurring fees before treating savings as NOI. Model capital, financing and tax effects separately.
Valuation scenarios need a stated capitalization assumption and market review. Efficiency alone does not establish rent, occupancy or cap-rate changes.
Maintain a property energy file
- Meter responsibility register.
- Bills, interval data and reconciliations.
- Agreements and notice deadlines.
- Operating approvals and schedules.
- Reimbursement assumptions.
- Project costs and measurement plans.
Sources and scope
- ENERGY STAR: building benchmarking
- DOE: energy management information systems
- DOE: re-tuning existing buildings
- DOE Better Buildings: green leasing and split incentives
Reviewed October 12, 2026. Confirm effective tariffs, program rules and signed terms for the actual account. Hypothetical examples are planning calculations, not current offers or client results.
Request a property energy review